Comer Construction​ Services

Our Blog:


Life On Site.


Latest from the blog - 24th February

So after the snow and freezing temperatures, came the rain. Life on site went a bit quiet but we are back and the walls are going up.

Delays with the steel beam that sits over the b-fold doors means this week has been frustratingly far less productive than it shoudl have been. The beam is due to be delivered today and we should get the walls up to plate and be staring on the roof by the end of the week. Fingers crossed.


Our Latest Blog Entry

12th February 2021

So we have been busy working on a Wimpey No Fines house since before Christmas. It's a first for us and has taken a different way of thinking. We marked our cut lines across the building and drilled about 100 holes along the line to give as a guide for breaking out. As the house is Wimpey No Fines, the walls are concrete but with no 'fines' so, no small aggregate and no sand in the concrete. As such we wanted to get a good line across to break up to, hence the drilling. We then spent a few days breaking out the concrete under the line (having supported the wall above with Acrows first!). The picture to the left is after we installed the huge 254mm beam with a 300mm plate welded to the top and the 204mm posts. Freezing temperature have put a stop to block laying but hopefully next week will bring higher temperatures and we can get the walls up!